house reno week 11
We now have a sewerage and storm water system installed. Shuttering for some of the concrete slab installation can be seen in the foreground.
The build seems to be going slow at the moment probably 2 months behind schedule. We are still very happy with the builder though, he is doing a thorough job.
[joe]
0 Comments:
Post a Comment
<< Home